by manoamano | Jun 1, 2017 | Blog
Building the Levee Wall for the Maldonado Water Reservoir The work of removing unwanted soil – in the area where the levee wall will be built for this reservoir – has been cleared and dug out/in about 4-5 meters deep along the whole way of the levee. When...